All Projects
electrical
completed
Supply & Installation of Rack System Reefer Panel at Patenga Container Terminal
Supply & Installation of Rack System Reefer Panel at Patenga Container Terminal for Chittagong Port Authority at PCT.
Client
Chittagong Port Authority
Location
PCT
Completed
June 2023
Related Projects
Work (SOW) CCTV Rack Shifting and Associated Infrastructure Relocation at SCY
Work (SOW) CCTV Rack Shifting and Associated Infrastructure Relocation at SCY
Investigation, Testing, Rectification of Transformer-01 (87 Trip), and Testing of Transformer-02 at PCT Substation-01.
Investigation, Testing, Rectification of Transformer-01 (87 Trip), and Testing of Transformer-02 at PCT Substation-01.
SoW of DR Site Relocation, Reinstallation, Testing & Commissioning.
SoW of DR Site Relocation, Reinstallation, Testing & Commissioning.