Investigation, Testing, Rectification of Transformer-01 (87 Trip), and Testing of Transformer-02 at PCT Substation-01.
Ø Magnetic Balance Test
Ø Vector Group Verification Test
Ø Transformer Turns Ratio (TTR) Test
Ø Winding Resistance Measurement
Ø Insulation Resistance (IR) Test
Ø No-Load Loss and No-Load Current Test
Ø Load Loss and Short-Circuit Impedance Test
Ø Applied Voltage / High Voltage Withstand Test
Ø HV Excitation Current Measurement
Ø LV Excitation Current Measurement
Ø Capacitance and Tan Delta / Power Factor Test
Ø Transformer Oil Testing, including BDV and DGA
Ø OLTC Functional Test
Ø Sweep Frequency Response Analysis (SFRA) Test
Ø Transformer CT Test
Ø Functional Testing of Buchholz Relay and associated transformer protection devices
Ø Protection Relay Configuration Verification, Setting Review, Calibration and Adjustment, including 87 Differential Protection, REF, OCR, EFR and other applicable functions
Ø Fault investigation, root-cause analysis and required rectification
Ø Recommissioning and functional verification after successful rectification
Ø Submission of complete Test Report, Analysis, Recommendations and Commissioning Certificate
Related Projects
Work (SOW) CCTV Rack Shifting and Associated Infrastructure Relocation at SCY
Work (SOW) CCTV Rack Shifting and Associated Infrastructure Relocation at SCY
SoW of DR Site Relocation, Reinstallation, Testing & Commissioning.
SoW of DR Site Relocation, Reinstallation, Testing & Commissioning.
Installation of High Mast Lighting System and Ancillary Electrical Works at SCY
Installation of High Mast Lighting System and Ancillary Electrical Works at SCY at SCY Yard.