Supplying, Installing, Testing & Commissioning of Thyristor Controlled Industrial Battery Charger (415V AC to 110V DC & 110V DC to 220V AC) & Battery for SCY Substation.
Submersibles water line Preservation work
Supply and installation work of Earth boring at SCY Substation (Including, Civil, Electrical and Painting work).
Supply Of Heat shrink Termination kit, alcohol.
Removal of Light Mast-19 and others related work at PCT
Supply, installation, testing of electrical facilities and ducting of Fan work for CFS Shed fan
Water Supply facility for washing bay at SCY
Construction of Walkway & Yard Surface Levelling Work front side of CFS shed for PCT
PCT Admin Building Ground floor Canteen Toilet Ceiling Works

+
Modifying the control wiring and conducting functional testing of the incoming LT switchgear bus coupler of an air circuit breaker (ACB) at PCT substation-02